New House Construction Sydney & NSW

Custom new home construction across Greater Sydney, from design through to handover. Detailed specification and costing process on every project – no vague allowances, no surprises at contract stage.

Request a Quote

State Property Development builds new custom homes across Greater Sydney. NSW Builders Licence 355555C. $20M public liability. HIA Member 1269991. Jay Singh manages every new build personally from initial costing through to final handover.

New home construction is where vague quotes cause the most damage – allowances that don’t reflect real specification, PC items priced at a level nobody would actually choose, and a final contract price that bears little resemblance to what was verbally discussed. We work through a detailed specification process before pricing any new home, covering everything from framing type and ceiling height through to tile and carpet allowances, so the number you’re quoted is the number you actually pay.

What We Cover in the Costing Process

  • Site conditions – flat or sloping land, elevated or standard, number of levels
  • Construction type – concrete slab (on-ground or suspended), timber or steel framing
  • Wall construction – blockwork, double brick, brick veneer, or cladding
  • Roof type – concrete tiles, terracotta tiles, slate, or Colorbond
  • Internal specification – ceiling heights, door heights, room sizes by area
  • Kitchen, bathroom, and laundry specification including benchtop and cabinetry detail
  • Electrical scope – downlights, power points, data points, air conditioning
  • Tile, carpet, and timber laminate allowances specified as actual dollar figures, not vague “standard” terms

What Affects the Cost

New house construction costs depend on the size and design of the home, the number of storeys, structural and site conditions, and the level of finish selected. Sloping or elevated sites add cost for footings, retaining, and access – assessed per site. Every project is individually assessed and priced according to its design, scope, site conditions and required level of finishes.

Use our Free Preliminary Building Estimate tool for a ballpark figure based on your project, or contact us directly for a tailored assessment. These figures are construction only and exclude land purchase, demolition of any existing structure on site, and site-specific costs like retaining walls or difficult access.

Design and Approval

Design and approval typically takes 4-6 weeks where a Complying Development Certificate (CDC) pathway applies. Sites or designs that don’t meet CDC criteria require a Development Application (DA), which takes longer and depends on your specific council. We advise on the correct pathway before you commit to a design.

Why a Detailed Costing Process Matters

Most new home cost blowouts happen because the original quote was based on allowances – a dollar figure per square metre for tiles, an unspecified “standard” kitchen, a vague ceiling height assumption – that never matched what the client actually wanted once selections were made. We fill out a detailed specification with you before pricing, covering the same level of detail as a formal costing form: framing type, wall construction, room-by-room sizing, tile and carpet dollar allowances, and PC item level (basic, standard, or premium). This is what makes our quoted price the price you actually pay.

Disclaimer: All information on this website is indicative only and provided as a general guide. Final construction costs will vary depending on architectural design, structural engineering requirements, hydraulic design, BASIX/NatHERS compliance, geotechnical (soil) reports, site conditions, council or certifier requirements, selected finishes, inclusions, and overall project scope. A detailed quotation can only be provided once all relevant plans, reports, and specifications have been completed and reviewed.

→ See also: Duplex Construction Sydney

→ See also: Knockdown Rebuild Sydney

New House Construction FAQs

Yes. NSW Builders Licence 355555C. $20M public liability. HIA Member 1269991. We build single and two storey custom homes across Greater Sydney, working through a detailed costing process before pricing any project.

Every new home is individually assessed and priced according to its design, size, site conditions and required level of finishes. Get a free preliminary estimate or contact us directly for a tailored figure.

Design and approval: 4-6 weeks for CDC pathway, longer for DA. Construction: 8-11 months single storey, 10-14 months two storey. Total project time typically 10-18 months from initial costing to handover.

Most new home cost blowouts come from vague allowances that don’t match what clients actually select. We specify framing, wall construction, room sizes, and tile/carpet dollar allowances upfront so the quoted price is the price you pay.