Office Fit Outs and Refurbishments in Sydney
We deliver office fit outs and refurbishments across Sydney as a licensed builder, not a fit-out-only firm. That means partitions, ceilings, joinery, kitchens and services, plus any structural change, landlord coordination and after-hours work, all under one contract. The licensed builder who scopes your project is the one who runs it.
What is included in an office fit out?
Most office fit-outs in Sydney are Category B works: everything that turns a landlord’s base building into your workplace. That typically covers partitions and glazing, suspended ceilings, floor finishes, kitchens and breakout areas, meeting rooms with acoustic treatment, joinery, lighting, power and data, and the mechanical adjustments that go with a new layout.
Category A is the landlord’s base build: the raised floor or slab, ceiling grid, air conditioning and fire services as handed over. Where Cat A work needs remediation before your fit-out can proceed, we flag it in the scope, so you are not paying for base-building problems inside your fit-out budget.
Office fit out, refurbishment or relocation: which do you need?
- A fit out suits a new lease or an empty tenancy. We start from the base building and deliver a finished floor.
- A refurbishment suits a team staying put. We re-plan, replace finishes and upgrade kitchens and meeting rooms while you keep working, usually in stages and often after hours. Premises of any type that must keep trading are covered on our commercial renovations page.
- A relocation fit out combines the two: fitting out the new premises while the old one is made good for the landlord.
Not sure which applies? Tell us the lease position and we will tell you what the contract should cover.
What do we do on an office fit out in Sydney?
- Open-plan refurbishments and full-floor fit outs
- Meeting rooms, quiet rooms and acoustic partitioning
- Kitchens, breakout spaces and end-of-trip upgrades
- Structural changes, including new openings and internal stairs
- Coordination of mechanical, electrical, data and fire services
- Landlord approvals and make-good at lease end
- After-hours and weekend works in occupied buildings
We work in the Sydney CBD, North Sydney, Macquarie Park, Parramatta, Norwest and across Greater Sydney.
→ New office on the cards? Get a free preliminary estimate, request a quote or call 1300 998 678.
Which approvals and standards apply to office fit outs in NSW?
Office tenancies are Class 5 buildings under the National Construction Code. Most fit-outs proceed as complying development or as internal alterations under a construction certificate, with a development application only where the use or the building changes. Section J of the NCC sets energy efficiency rules that affect lighting and glazing choices. AS 1428.1 governs access, including door widths, circulation and accessible amenities. We confirm the pathway with your certifier before the programme is set.
How long does an office fit out take?
We issue a construction programme before the contract is signed. As an indicative guide only, a smaller office refurbishment may take around six to ten weeks on site, a 300 to 500 square metre fit out around ten to fourteen weeks, and work involving structural change or a full floor fourteen to twenty-two weeks. Actual timeframes depend on the project scope, site conditions, approvals and specifications. Landlord approvals and long-lead items such as joinery and glazing sit in front of those figures, which is why the programme is agreed early.
For the factors that drive budget, read what an office fit out costs in Sydney.
Every project runs on a written scope and a signed contract. The scope lists what is included, what is excluded and which approvals are needed. The contract sets out how any change to that scope is priced and agreed before the work goes ahead, so there are no surprises at handover.
Why choose us as your office fit out company?
Office fit-out companies in Sydney range from interior designers who subcontract the build to large firms with account managers between you and the site. We sit in neither camp. You deal with the licensed commercial builder who scopes the job, prices it, runs the site and completes the handover. We also deliver retail and hospitality fit outs.
Credentials
State Property Group Pty Ltd trading as State Property Development, ABN 44 641 025 863. NSW Builders Licence 355555C, verifiable through Service NSW. $20 million public liability insurance, certificate of currency available on request. Master Builders Association NSW member 3510192.
Disclaimer: All information on this website is indicative only and provided as a general guide. Final costs and timeframes depend on the design, structural and services engineering, site conditions, council, certifier and landlord requirements, selected finishes, inclusions and the overall project scope. A detailed quotation can only be provided once the relevant plans, reports and specifications have been completed and reviewed.
Office Fit Out FAQs
The cost turns on four things: the specification level, the condition of the existing tenancy, the scope (a refurbishment costs less than a full-floor fit out) and the landlord’s Cat A requirements. We price each project individually after a site inspection. Start with our free preliminary building estimate, then we will give you a written scope and quote.
Cat A is the landlord’s base build: ceilings, floors, air conditioning and fire services as handed over. Cat B is the tenant’s fit out: partitions, joinery, kitchens, meeting rooms, finishes and workstations. We deliver Cat B and flag any Cat A remediation before the build starts.
As an indicative guide, a small refurbishment may take six to ten weeks on site, a 300 to 500 square metre fit out ten to fourteen weeks, and full-floor or structural work fourteen to twenty-two weeks. Actual timeframes depend on the project scope, site conditions, approvals and specifications. We issue the programme before signing. Landlord approvals and long-lead joinery sit ahead of those figures.
Yes. Most refurbishments in occupied offices run in stages with noisy work after hours or at weekends. We agree the staging plan and the building’s after-hours access rules with you and the landlord before work starts.
Usually not. Most internal office fit-outs proceed as complying development or under a construction certificate as internal alterations. A development application is needed when the use changes or the works affect the building’s structure, facade or fire systems. We confirm the pathway with your certifier before the programme is set.