Office Fitouts Sydney & Greater NSW

Commercial office fitouts from 200sqm to full floor. Design and construct, or construct from approved drawings. Cat B fitout specialists across Greater Sydney and regional NSW.

State Property Development takes on commercial office fitouts across Greater Sydney and regional NSW. We hold NSW Builders Licence 355555C and $20M public liability insurance. From open-plan office refurbishments to full floor fitouts with meeting rooms, breakout spaces, and acoustic treatment — we build to programme and manage all licensed subcontractors directly.

Most office fitouts are Category B scope — partitions, ceiling finishes, flooring, kitchen and breakout area, specialist lighting, AV, and joinery. We price Cat B clearly. If the building’s Cat A base work (HVAC distribution, base lighting, fire services) needs remediation before your fitout can proceed, we’ll tell you upfront, not mid-build.

Office Fitout Cost Ranges — Sydney 2026

SpecificationWhat’s includedCost per sqm
Basic Cat BPartitions, carpet, basic lighting, kitchen, WCs$800–$1,200
Mid-specificationMeeting rooms, joinery, feature lighting, breakout$1,200–$1,800
High specificationPremium joinery, acoustic treatment, specialty lighting, AV$1,800–$2,500+

What We Do

  • Office fitouts 200sqm to full floor
  • Open-plan refurbishments — partition removal, new ceiling, flooring
  • Meeting rooms, boardrooms, and acoustic partitioning
  • Kitchen and breakout area construction
  • Structural changes — wall removal, penetrations, load transfer
  • Landlord coordination for Cat A integration
  • After-hours and weekend construction to minimise tenant disruption

Timeline

A 300–500sqm office fitout takes 10–14 weeks from approved design to practical completion in a Cat A base. Smaller fitouts under 200sqm take 6–10 weeks. Fitouts with structural work or full floor scope take 14–22 weeks. We issue a construction programme before you sign — tied to milestones, not arbitrary dates.

Full office fitout cost guide — Sydney 2026

How long does commercial construction take?

Office Fitout FAQs

$800 to $2,500 per sqm for Cat B fitout. A 300sqm mid-spec fitout runs $360,000–$540,000. A 500sqm premium fitout runs $900,000–$1.25M. These are 2026 Greater Sydney figures. Full cost guide here.

Cat A is the landlord fitout — HVAC, base lighting, ceiling grid, fire services. Cat B is the tenant fitout — partitions, joinery, specialist lighting, kitchen, AV, flooring finishes. You pay for Cat B. When getting quotes, confirm exactly what’s in scope.

300–500sqm: 10–14 weeks. Under 200sqm: 6–10 weeks. Full floor with structural changes: 14–22 weeks. All from DA approval or confirmed exemption, not from when you call us.

Yes. For fitouts within occupied buildings, we schedule noisy or disruptive work — demolition, core drilling, structural work — after hours or on weekends. We confirm this in the programme before construction starts.