Licensed Commercial Builder · NSW Licence 355555C · $20M PL
Childcare Centre Builders in Sydney
State Property Development builds childcare centres in Sydney for approved providers and developers: new Class 9b buildings and fit outs of existing tenancies, for long day care, occasional care and outside school hours care. We design to the National Regulations space rules from the first sketch, so the building size and the DA match the number of approved places.
What do childcare centre builders in Sydney need to get right?
Childcare centres are Class 9b buildings under the National Construction Code, and the Education and Care Services National Regulations set minimum usable space per child. In NSW that is 3.25 square metres of unencumbered indoor space and 7 square metres of outdoor space for each approved place. Those are minimums for usable area only. Bathrooms, kitchens, sleep rooms, storage, corridors and staff areas sit on top.
A common mistake in childcare projects is pricing on gross floor area. The centre ends up short on licensable space, and the provider loses places. We treat the space rules as design inputs and check them before pricing, not after contract.
What do we build for childcare providers?
- New childcare centres, from slab to fit out, on greenfield and infill sites
- Childcare fit outs of existing commercial tenancies, including ground-floor retail and former offices
- Long day care, occasional care and OOSH facilities of different sizes
- Design and construct delivery under one contract, with coordination of the DA or CDC included
- Outdoor play areas, including soft-fall, shade structures, landscaping and fencing to regulation
→ Got a centre to build? Get a free preliminary estimate, request a quote or call 1300 998 678.
The space requirements we build to
| Requirement | NSW standard | Example for 60 places |
|---|---|---|
| Indoor unencumbered space | 3.25 sqm per child | 195 sqm minimum |
| Outdoor unencumbered space | 7 sqm per child | 420 sqm minimum |
| Building classification | NCC Class 9b | Applies at all sizes |
| Access | AS 1428.1 | All areas accessible |
Source: Education and Care Services National Regulations, regulations 107 and 108. Figures checked 9 November 2026. Your approved provider application and the certifier’s assessment confirm the final numbers for your site. See ACECQA requirements in NSW for more detail.
How does childcare construction run from brief to opening?
- Feasibility. We check the site against zoning, the likely number of places and the space rules before you commit.
- Design and approvals. We coordinate the architect and consultants through the DA or CDC process and work with your registered certifier. Your service approval application can run alongside.
- Construction. As an indicative guide, new builds may take 20 to 30 weeks on site after approvals and tenancy fit outs 16 to 24 weeks. Actual timeframes depend on the project scope, site conditions, approvals and specifications. We issue the programme before the contract is signed.
- Handover. Occupation certificate, compliance documents, as-built drawings and the paperwork your service approval needs.
Indicatively, a new centre can take 12 to 18 months from brief to opening, including DA, design and construction. The approvals timeframe sits largely with the consent authority and your certifier. For the factors that drive budget, read what a childcare centre costs to build.
Every project runs on a written scope and a signed contract. The scope lists what is included, what is excluded and which approvals are needed. The contract sets out how any change to that scope is priced and agreed before the work goes ahead, so there are no surprises at handover.
Building completion is not the same as approval to operate
The occupation certificate confirms the building is complete and compliant. Approval to operate comes separately from the NSW Regulatory Authority under the National Law, and you apply for it as the approved provider. We build to make that application smooth, and we hand over the compliance documents it needs, but the service approval sits with you. Ask us for the checklist that separates the two.
What to ask any childcare builder before you sign
Ask for the licence number and check it on Service NSW. Ask for the public liability limit. Ask whether they have delivered a Class 9b building before, and ask which compliance documents they prepare before construction starts. Ask us the same questions.
As a licensed commercial builder in Sydney, we also deliver medical and dental fit outs with similar compliance detail.
Credentials
State Property Group Pty Ltd trading as State Property Development, ABN 44 641 025 863. NSW Builders Licence 355555C, verifiable through Service NSW. $20 million public liability insurance, certificate of currency available on request. Master Builders Association NSW member 3510192.
Disclaimer: All information on this website is indicative only and provided as a general guide. Final costs and timeframes depend on the design, structural and services engineering, site conditions, council, certifier and landlord requirements, selected finishes, inclusions and the overall project scope. A detailed quotation can only be provided once the relevant plans, reports and specifications have been completed and reviewed.
Childcare Centre Construction FAQs
We build to the Education and Care Services National Regulations, including the 3.25 square metre indoor and 7 square metre outdoor minimums per approved place in NSW, and we document those requirements before construction starts. ACECQA sets the national framework; the NSW Regulatory Authority assesses and approves your service.
Cost depends on whether it is a new build or a fit out of an existing shell, the site conditions, the specification level and the outdoor play area works. Each project is priced individually after a site inspection. Use our free preliminary building estimate for a starting point, then we give you a written scope and quote.
As an indicative guide, new builds may take 20 to 30 weeks on site once approvals are in place, and tenancy fit outs 16 to 24 weeks. From brief to opening, including DA, design and construction, a new centre can take 12 to 18 months. Actual timeframes depend on the project scope, site conditions, approvals and specifications.
Yes, under a design and construct arrangement. We coordinate the designers and consultants, prepare the DA or CDC documentation with them, and work with your registered certifier through to the occupation certificate. The approvals pathway and who is responsible for each step are written into the contract scope.
Yes. Class 9b construction requires a NSW contractor licence (builder). Ours is 355555C, verifiable on the Service NSW licence check.