Commercial Renovations in Sydney That Keep Your Business Trading
State Property Development carries out commercial renovations across Sydney: refurbishing shops, offices, clinics, cafes and venues that need to keep operating while the work happens. As a licensed builder we handle structural changes, services upgrades and new finishes, and coordinate the approvals, under one contract, staged and often after hours so your business stays open.
What counts as a commercial renovation?
A commercial renovation upgrades premises you already occupy. It might be a new shopfront and interior for a retailer whose lease has just renewed, a re-plan of an office that has outgrown its layout, a refresh of a dental practice between accreditation cycles, or a refurbishment of a club bar and dining area. The common thread is that the business is trading before, during and after the work.
A full fit out of an empty tenancy is a different job and has its own page for offices and shops.
What do we renovate?
- Shops and showrooms, including shopfronts, joinery and lighting
- Offices: re-planning, partitions, kitchens, meeting rooms and finishes
- Medical and dental practices and allied health rooms
- Cafes, restaurants, bars and club dining areas
- Childcare centres, including outdoor play areas
- Warehouse offices and amenities
- Accessibility upgrades: ramps, accessible amenities and door hardware to AS 1428.1
- Make-good works at lease end
How do we renovate without closing you down?
The staging plan is the whole job. We split the premises into work zones, build temporary partitions and dust control, run noisy work after hours or at weekends, and keep services live to the trading areas. The programme shows which zone is affected each week, so you can plan rosters, deliveries and customer communication. On occupied office floors we agree after-hours access with the building manager before the contract is signed.
→ Need to renovate while you trade? Get a free preliminary estimate, request a quote or call 1300 998 678.
Which approvals does a commercial renovation need?
Many internal commercial renovations proceed as complying development or as internal alterations under a construction certificate. A development application is needed when the use changes, the facade or structure is altered, or the fire systems are affected. Shopping centre tenancies also need centre management approval. We confirm the pathway with your certifier before setting the programme.
How long does a commercial renovation take?
It depends on the scope and on how much of the premises stays in use. Staged works take longer on the calendar than a closed-site fit out of the same scope, because each zone is finished before the next is started. We issue a programme before the contract is signed and track it weekly.
Every project runs on a written scope and a signed contract. The scope lists what is included, what is excluded and which approvals are needed. The contract sets out how any change to that scope is priced and agreed before the work goes ahead, so there are no surprises at handover.
Why choose a licensed builder for a commercial renovation?
Renovations uncover things: undocumented services, non-compliant fire separation, structure that is not where the drawings say. A licensed commercial builder in Sydney can deal with all of it under the one contract and the one licence. Ours is 355555C, with $20 million public liability. The State Property team inspects before pricing and runs the job.
Credentials
State Property Group Pty Ltd trading as State Property Development, ABN 44 641 025 863. NSW Builders Licence 355555C, verifiable through Service NSW. $20 million public liability insurance, certificate of currency available on request. Master Builders Association NSW member 3510192.
Disclaimer: All information on this website is indicative only and provided as a general guide. Final costs and timeframes depend on the design, structural and services engineering, site conditions, council, certifier and landlord requirements, selected finishes, inclusions and the overall project scope. A detailed quotation can only be provided once the relevant plans, reports and specifications have been completed and reviewed.
Commercial Renovation FAQs
It depends on the size of the premises, how much of the structure and services change, the finish level and whether the work is staged around trading. Each project is priced individually after a site inspection. Start with our free preliminary building estimate, then we give you a written scope and quote.
Yes. We split the premises into work zones, control dust and noise, keep services live to the trading areas and run disruptive work after hours or at weekends. The programme shows which zone is affected each week.
Often not. Internal renovations frequently proceed as complying development or under a construction certificate. A development application is needed when the use, facade, structure or fire systems change. We confirm the pathway with your certifier before the programme is set.
A fit out turns an empty tenancy into a finished workplace or shop. A renovation upgrades premises you already occupy, usually while you keep trading. The scope can overlap, but the staging, approvals and programme are different.
Yes. We return the tenancy to the condition the lease requires, coordinate with the landlord or centre management, and can run the make-good alongside the fit out of your new premises.