We build medical fit outs and dental fit outs across Sydney as a licensed builder: GP and bulk-billing practices, specialist clinics, allied health rooms and single or multi-chair dental surgeries. Infection-control surfaces, chair plumbing and suction, clinical air handling and the approvals pathway are all settled in the scope before we price the job.
Why is a medical fit out different from an ordinary office fit out?
Three things drive the difference: surfaces, services and sign-off.
Surfaces in clinical areas must be non-porous, cleanable and resistant to medical-grade disinfectants. Coved floor junctions, sealed penetrations, grout choice and ceiling type all carry infection-control consequences. Services are denser than in any office: medical gases in some suites, dedicated circuits for imaging equipment, extra hot water, and in dental rooms, air, water and suction to every chair. Sign-off involves your certifier, your practice accreditation body and, where reusable instruments are reprocessed, the AS/NZS 4187 requirements for that zone.
We document the requirements for each room before construction starts, so the practice manager is not discovering problems at the accreditation inspection.
What do we build for medical and allied health practices?
- GP and bulk-billing practice fit outs
- Specialist clinics, including orthopaedic, cardiology, oncology and paediatric suites
- Allied health rooms for physiotherapy, psychology and occupational therapy
- Pathology collection rooms and minor procedure rooms
- Imaging preparation rooms, with shielding where the equipment requires it
- Reception, waiting and staff areas designed around patient flow
What is involved in a dental fit out?
Dental fit outs are the most plumbing-intensive commercial work per square metre. Each chair needs cold water, hot water, compressed air and suction. A four-chair practice carries suction and compressor infrastructure well beyond standard commercial plumbing, and the plant room needs space, ventilation and acoustic treatment. Amalgam separators and trade waste approval are required by the water authority, and in a new tenancy the drainage runs must be set before the slab is poured or cut.
Radiography rooms need shielding assessed by a qualified expert, and the layout must allow operators to stand clear during exposure. We coordinate the dental equipment supplier, the radiation consultant and the hydraulic engineer so the room is built around the chair, not the other way round.
→ Need a practice built or expanded? Get a free preliminary estimate, request a quote or call 1300 998 678.
Which building classes and standards apply to medical fit outs in NSW?
The NCC classification depends on the clinical scope. Many GP, specialist and dental practices are assessed as Class 5 or Class 6 tenancies. Facilities where patients may need assistance to evacuate, such as day surgeries with sedation or procedure rooms, may fall under Class 9a (health-care building). Your certifier confirms the class, and it changes the fire and egress requirements, so we settle it before documentation is finalised. The Australasian Health Facility Guidelines (AusHFG) inform room sizes and clinical layouts, and AS 1428.1 governs access throughout.
How long does a medical or dental fit out take?
We issue a construction programme before the contract is signed. As an indicative guide only, a GP practice of 200 to 400 square metres may take ten to sixteen weeks on site, a multi-chair dental surgery twelve to eighteen weeks, and a specialist suite with procedure rooms fourteen to twenty-two weeks. Those figures run from approval, not from first enquiry. Actual timeframes depend on the project scope, site conditions, approvals and specifications. Equipment lead times, particularly dental chairs and imaging, often set the critical path.
Every project runs on a written scope and a signed contract. The scope lists what is included, what is excluded and which approvals are needed. The contract sets out how any change to that scope is priced and agreed before the work goes ahead, so there are no surprises at handover.
Why choose a licensed builder for your medical fit out?
Many Sydney medical fit-out firms are interior specialists who subcontract structural and services work. We hold the builders licence, so structural openings, slab cutting for dental drainage, services upgrades and the approvals pathway all sit within one contract and one point of accountability. The State Property team scopes, prices and runs the job, and the same people answer the phone.
As a licensed commercial builder in Sydney, we also work as childcare centre builders and deliver office fit outs.
Credentials
State Property Group Pty Ltd trading as State Property Development, ABN 44 641 025 863. NSW Builders Licence 355555C, verifiable through Service NSW. $20 million public liability insurance, certificate of currency available on request. Master Builders Association NSW member 3510192.
Disclaimer: All information on this website is indicative only and provided as a general guide. Final costs and timeframes depend on the design, structural and services engineering, site conditions, council, certifier and landlord requirements, selected finishes, inclusions and the overall project scope. A detailed quotation can only be provided once the relevant plans, reports and specifications have been completed and reviewed.
Medical and Dental Fit Out FAQs
Cost depends on the type of practice, the number of consult or treatment rooms, the services density (dental suction and plumbing adds the most), the existing tenancy condition and the finishes. Each project is priced individually after a site inspection. Start with our free preliminary building estimate and we follow with a written scope and quote.
Dental fit outs cost more per square metre than most commercial work because of chair plumbing, suction, compressor plant and radiography shielding. The number of chairs, the plant room location and whether drainage already exists drive the figure. We price each surgery individually and set out inclusions and exclusions in a written scope.
As an indicative guide, a GP practice of 200 to 400 square metres may take ten to sixteen weeks on site, a multi-chair dental surgery twelve to eighteen weeks, and a specialist suite with procedure rooms fourteen to twenty-two weeks. Timelines run from approval, and equipment lead times often set the critical path. Actual timeframes depend on the project scope, site conditions, approvals and specifications.
The National Construction Code sets the building class, which depends on clinical scope and is confirmed by your certifier. AS/NZS 4187 applies to instrument reprocessing areas, AS 1428.1 to access, and the Australasian Health Facility Guidelines inform clinical layouts. Radiography rooms need shielding assessed by a qualified expert.
Yes. We coordinate the complying development certificate or development application with your designers and consultants, work with your registered certifier through to the occupation certificate, and hand over the construction and infection-control documentation your accreditation body needs.